Monday Jun 5, 2023
 

News

Dredging of Roga Shanbe-Bazaar in Bandar Anzali/ Accumulation of 60,000 Cubic Meters of Mud

Dredging of Roga Shanbe-Bazaar in Bandar Anzali/ Accumulation of 60,000 Cubic Meters of Mud
Director General of Ports and Maritime Authority f Guilan Province, referring to the dredging of Roga Shanbe-Bazaar in Bandar Anzali by this organization, said: "Due to not dredging during the last forty years and mud settlements for various reasons, we are facing the accumulation of more than 60,000 cubic meters of mud."

According to the public relations of the Ports and Maritime Authority f Guilan Province, Dr. Hamidreza Abaie stated on the sidelines of dredging Roga Shanbe-Bazaar in Bandar Anzali that in order to interact with the city and port and in line with social responsibilities, the Ports and Maritime Authority f Guilan Province dredged mud from the estuary of the river by barge and shovel method. He continued: “With the coordination of the Department of Environment, Municipality, City Council and Anzali Governorate, and with the follow-up and assistance of the esteemed representative of Anzali Port, we were able to take the necessary measures for dredging 900 meters from the length of this canal to a depth of 3 meters.”

Referring to the high volume of mud in this area, he added: "Considering that 30 to 40 years have passed since the last dredging of this Roga and the mud settlement has increased significantly for various reasons (including the entry of municipal and industrial wastewater), in this project, we are facing the accumulation of more than 60,000 cubic meters of mud.”

Stating that we are looking to create conditions that can without disturbing the movement of boats and people's livelihood, using various dredging methods and taking advantage of the facilities of local companies active in this field,‌ take the necessary measures,  Director General of Ports and Maritime Authority f Guilan Province pointed out: “We first did this using barges and long-arm excavators.”

Stating that we are trying to speed up the completion of the project, Abaie said: "If we continue to work in the same way, we can remove the dredging material from the bottom of the river and create a suitable depth so that the water circulation can be faster.”

It is worth mentioning that the Ports and Maritime Authority f Guilan Province in the past years and in order to interact between the city and the port, has repeatedly dredged the waterways leading to Anzali Port basin in very high volumes, while no other body or organization has taken any action in this regard.

May 8, 2021 10:48
Number of visit : 303

Comments

If you want to submit a comment, you should login to the system first. To login please click the login button.